Skip to main content
Skip table of contents

Mennekes | Amedio - Configuration for ChargePilot

Before starting the configuration, please check the charger firmware version complies with the latest compatible firmware version.

Please follow the instructions in ebee - Configuration for ChargePilot

Addtional or deviating steps are listed below

Connection to the charger

Login credentials

Username: operator
Password: aquired from the customer

Other charger settings

Fallback settings

Fallback works only with the FW version ≥ 5.33.x

  1. Navigate to Load Management Local

  2. Enable Disconnected Upper Limit for SmartCharging: Disable

image-20240304-161609-20240319-165200.png

MeterValueSampleInterval (if not 4s)

Configuration of the MeterValues interval for the connector 2 (This step should still be done maually within the current FW version)

  • Option 1: Add the envvar MeterValueSampleInterval_2 = 4s in Balena

  • Option 2: Open the webinterface of the connector 2, change the field “Meter Value Sample Interval (OCPP)” to 4s

JavaScript errors detected

Please note, these errors can depend on your browser setup.

If this problem persists, please contact our support.